QINGDAO: China has entered a major construction milestone with the start of the core hull block erection stage for Asia’s largest cylindrical Floating Production, Storage and Offloading (FPSO) unit.
The offshore facility, independently designed and built by China, entered the assembly phase on November 10 at COOEC’s Qingdao International High-end Equipment Manufacturing Base.
The 100,000-tonne FPSO is designed to process, store and offload oil. Once completed, it will serve China’s Kaiping South Oilfield.

Modular Construction Process
The facility’s hull consists of 182 individual blocks, which are prefabricated, inspected and painted before being transported into the dock for assembly.
The blocks are then lifted into position and joined together, using a modular construction approach similar to assembling giant building blocks.
This method allows the massive offshore structure to be constructed through a series of prefabricated sections, highlighting the role of modular manufacturing in improving the scale and efficiency of deepwater energy equipment production.

The start of the core hull block erection stage marks an important step in the construction of the large-scale offshore facility.
The project highlights China’s capabilities in independently designing and building advanced offshore oil production equipment.






